Request For Afghanistan Cricket Board


Request For Construction of Cricket Pitch and water supply For Laghman Province Cricket Ground

 

 

 

 

 

 

 

AFGHANISTAN CRICKET BOARD

 

 

REQUEST FOR QUOTATIONS (RFQ) FOR

PROCUREMENT OF

 

 

Construction of Cricket Pitch and water supply

For

Laghman Province Cricket Ground

 

 

 

 

 

 

 

 

 

 

August, 2022

 

                          Instructions to Users

This instruction notes have been prepared to assist a Procuring Entity/user in the preparation of the Standard Request for Quotations (SRFQ) for procurement of Goods and non-consultancy services. The Procuring Entity/user should also refer to the procurement manual date 2017 Of ACB.

The use of SRFQ applies when a Procuring Entity/user (the Purchaser) wishes to select a Supplier for the procurement of Goods and non-consultancy services as per procurement manual

The Procuring Entity require Performance Security because of the nature of the procurement method is AFN 50,000.

The confirmation of the Award should be in the form of a Contract, prepared by the Procuring Entity, attached to which will be the Conditions of Purchase. The contract will be signed by both the Procuring Entity and the Supplier and will be treated as contract. Signing of a separate contract is not required.

Prior to the detailed evaluation of Quotations, the Contract shall determine whether each Quotation:

  1. meets the eligibility criteria;
  2. has been properly signed;
  3. Is substantially responsive to the requirements of the Request for Quotations Documents

 

Evaluation of Quotations

A substantially responsive Quotation is one which conforms to all the terms, conditions, and specifications of the Request for Quotations Documents.

 

To evaluate a Quotation, the Purchaser shall only use all the factors, methodologies and criteria defined hereinafter, no other criteria or methodology shall be permitted:

  1. evaluation will be done for Items or Lots;
  2. price adjustment for correction of arithmetic errors;
  3. price adjustment due to discounts offered;
  4. Adjustments due to the application of a margin of preference, if applicable.

If a Quotation is not substantially responsive, it shall be rejected by the Purchaser, and may not subsequently be made responsive by correction or withdrawal of the nonconforming deviation or reservation.

No negotiation shall be held with the lowest or any other Bidder.

A bidder shall not be required, as a condition for award, to undertake responsibilities not stipulated in the Request for Quotations Documents, to have to change its price or otherwise modify its Quotation.

 

Request for Quotation for the Work Of

Construction of Cricket Pitch and water supply

For

Laghman Province Cricket Ground

 

Reference: ACB/ICC/PRO/CO/2022/Engineering/AFG/RFQ-0132

Issue Date: August 22, 2022 Closing Date: August 28, 2022

Name of the Supplier:                                                                                                                                            Address of the Supplier:                                                                                                                                          Contact No:                                                                 _ Email Add:                                                                                                                                        

 

  1. The Afghanistan Cricket Board has a budget allocation for the purchase of Goods; and is applying some of that allocation for the purchase of fresh meat for which this Request for Quotation is issued.
  2. Payments made against any Contract arising from this Request for Quotation will only be made in AFN. The Unit Rate(s) offered by the Supplier, if accepted, shall remain fixed for the duration of the contract.
  3. Your sealed quotation must be submitted to ACB committee members of the undersigned ON August 28, 2022 at 02:00 Kabul time. Any quotation received later than the scheduled time will be rejected and returned unopened. The sealed envelope containing the quotation must be clearly marked construction of cricket pitch and watery supply for laghman cricket ground and do not open before August 28, 2022.
  4. All quotations must be valid for a period of thirty (30) days from the closing date of the Request for Quotations.
  5. The quotation shall be completed and all pages shall be signed or stamp by an authorized representative of the Supplier.
  6. In the case of any arithmetical discrepancy between the Unit Rate and the Total Amount quoted, then the Unit Rate shall prevail both for the evaluation of quotations and for the subsequent contract.
  7. Depending on the final requirement, the quantities shown may increase or decrease by fifteen percent (15%) and this shall be reflected in the contract.
  8. There will be no public opening of quotations; the Purchaser is not bound to accept the lowest quotation and reserves the right to accept or reject any or all the quotations without assigning any reason whatsoever.
  9. Supplier with valid business license taxable at rate of 2% and supplier without valid business license at rate of 7%.
 

Schedule of Items and Priced Quotation including Services or Installation construction of cricket pitch and watery supply for laghman cricket ground

 

Project Number

 

Project Title

Pitch and water supply for Laghman  Province Cricket ground

Location

Laghman

Project Budget

 

This BoQ contains statements required in the offer documents and shall be signed by a duly authorized person.  Any addition, deletion or alteration in the BoQ may result in rejection of the offer.

NO

Description

Unit

Quantity

Unit Cost AFN

Total Cost AFN

1

Excavation with the required thickness of 16 inch for layering of Pitch material as per engineering instruction.

Cubic Meter

       80.00

 

 

2

95% compaction of the bottom surface of the pitches as per engineering instruction.PS: compaction on 12ton roller is must

Square Meter

     180.00

 

 

3

Supply and layering of fine sand with the required thickness of 2 inch at the bottom of pitch along with compaction.

Cubic Meter

       12.00

 

 

4

Supply and layering of Flaky boulder with required size of 10-15 cm as per engineering instruction with all related activities along with compaction by 12ton roller.

Cubic Meter

       24.00

 

 

5

Supply and layering of crush stone (pebble) with minimum size of 20-30mm as per engineering instruction with all related activities along with compaction by 12ton roller..

Cubic Meter

       24.00

 

 

6

Supply and layering of fine Khakah as per engineering instruction with all related activities along with compaction by 12ton roller..

Cubic Meter